_files/image002.gif)
_files/image003.gif)
_files/image004.gif)
RJP: 62Div:
100Days Latest edit 24 Feb 2011
62nd Division’s Part in
the Advance During the First half of the Final Hundred
Days of the War. (25.8.18 to 17.10.18)
See Map 6 for the
second half.
The
approximately parallel purple pecked lines are the 62 Div divisional boundaries
while 62Div was in the line. The breaks between them in moving from West to
East represent the periods when the division was resting and others were in the
line. It looks as though, when it came to crossing obstacles like the
Hindenburg Line and flooded rivers, 62Div was on duty.
Key
Main
German Defence Lines
British
Front Line 26.9.18
62nd
Divisional Boundaries
Canal
Tunnel
Places
named in the Text
Canals & rivers
are blue. At this stage, the Canal du Nord was incomplete and dry.
|
|
_files/image011.jpg)
62 Division Home page